Loading a used excavator is a rigging job before it is a shipping job. The machine is partially disassembled, blocked with timber, chained to the container floor, and photographed at each step — because a machine that shifts at sea arrives as a claim.

How is a machine configured and secured for shipping?

MachineTypical shipping configurationWhy
Mini excavator (1–6t)Intact, in a 20GP with other cargo or aloneFits with the boom folded
20-ton class excavatorBoom or arm removed, counterweight sometimes off, in a 40HQHeight and width exceed the door opening otherwise
30-ton and aboveFlat rack, often break-bulkWeight and dimensions exceed container limits
Wheel loaderIntact in a 40HQ where dimensions allowArticulated frame shortens the footprint
Light truckDriven or winched in, wheels chockedStandard roll-on loading

Exact counts per container depend on the specific machine's dimensions in its shipping configuration. We send you the loading plan with dimensions and weights before booking, and the plan is what the forwarder prices from.

Blocking and lashing — what to look for in the photos

  • Timber blocking against tracks or tyres, not just chains
  • Chains or straps rated for the machine's weight, with tensioners
  • Removed parts labelled and packed inside, not loose on the floor
  • Photos of all four sides after lashing, before the doors close

These photos are part of what you are paying for. If a seller cannot show them, the machine was loaded by someone who will not be there when it arrives.

Mixed loads and heavy cargo

Heavy units are positioned over the container's load-bearing cross members, not at the doors. When a container carries a machine plus parts, the parts go into the voids and are blocked so they cannot travel into the machine. Share the parts list before booking so the plan accounts for it.

What we send you before loading

Loading plan with dimensions, weights and blocking method; confirmation of the vessel and cut-off; and after loading, a photo set of the blocked machine with doors open and closed.

Weight limits people get wrong

There are three different ceilings and they are not the same number: the container's payload, the road limit on the haul from yard to port, and the vessel's stack weight. A 40HQ can be volumetrically full and still legal, or only half full and over the road limit. The verified gross mass declaration is what the carrier actually loads against, and it is calculated from the packed weight, not from an estimate.

ConstraintWhat it limitsWho checks it
Container payloadTotal cargo weight inside the boxForwarder, at booking
Road limitTruck plus container on the haul to portHaulier, at pick-up
VGMWhat the vessel accepts for stackingCarrier, before loading

Flat rack or container

The decision is mechanical, not commercial. If the machine in its shipping configuration fits inside the door opening with clearance and the weight is within payload, it goes in a container. If it does not, it goes on a flat rack and is lashed directly to the platform. Flat racks cost more and are less available to smaller ports, which is why the loading plan is drawn before the booking, not after.

Insurance and survey

Marine cover for used machinery should be arranged by the buyer, and the survey depends on photos. We photograph the machine before loading, the lashing from four sides, and the sealed doors. If a claim is ever needed, those photos plus the loading plan are the file.

Questions buyers ask before ordering

How many excavators fit in one 40HQ?

It depends on the machine's dimensions once the boom or arm is removed. A 20-ton class machine usually occupies a 40HQ alone; smaller units can share. We issue a loading plan with the actual figures before booking.

Do you disassemble the machine to fit?

Removing the boom, arm or counterweight is normal for larger units and is part of preparation. Parts are labelled, packed inside the container and listed on the packing list so nothing is lost in transit.

Can I see photos of loading?

Yes. You get the blocked and lashed machine photographed from all four sides before the doors close, plus the doors-open shot. We send them the day of loading, not at the end of the month.

Who arranges the flat rack for oversized machines?

We do, through the forwarder, and it is quoted as part of the shipping cost. Flat rack availability to smaller ports can be limited, which is one more reason the booking stage sets the date.

Last verified: 2026-11-06 · Sources: export documents on file, shipping line schedules, port authority notices.