Minimum Order Quantity
There is no container minimum on used machines. A single excavator or one light truck is a normal order for us, and roughly half of our first-time buyers start with one unit to test the process before committing to a container.
How does an order change when you buy one unit instead of a full container?
| Order size | How it ships | What it costs you | Best for |
|---|---|---|---|
| 1 machine | Shared container space or flat rack, booked with other cargo | Higher freight per unit; we quote both options | First order, testing the supplier |
| 2–3 machines | Often fills one 40HQ with careful loading | Freight per unit drops sharply | Contractor adding capacity |
| 4+ machines or mixed parts | Dedicated container | Lowest per-unit freight | Dealers and rental fleets |
Mixed orders are allowed
Machines and spare parts can travel in the same container. Parts are packed into the gaps around the machine and blocked so they cannot move in transit. If you need a machine plus a parts kit for that same model, say so before we book — the loading plan has to be drawn first.
What we need from you to quote
- Model or tonnage class (for example 20-ton excavator, 3.5t cargo truck)
- Destination port, so we quote CIF rather than FOB
- Whether you will inspect by video call or send a third-party inspector
With those three details we answer with a written quote, including the machine's year, hour meter reading and condition notes, within one working day.
Why we do not publish a fixed MOQ
Because the constraint is not a number on our side — it is the shipping economics on yours. One machine in a shared container is a legitimate order; ten machines get a different price. Quoting a fake "minimum order 5 units" would only filter out the buyers we actually want to talk to.
What one unit really costs, all the way to your yard
Buyers comparing quotes usually compare the machine price and nothing else. The number that decides the deal is the landed cost, and it has four parts: machine price, freight to your port, duty and tax at your customs, and inland transport from the port to where the machine works. On a single-unit order the freight share is the part most likely to surprise you, because it is not divided across a container.
| Cost line | Fixed or variable | What moves it |
|---|---|---|
| Machine price | Fixed per unit | Model, year, hours, condition |
| Ocean freight | Variable | Port pair, container utilisation, season |
| Duty and VAT | Fixed by tariff | HS code and declared value |
| Inland haulage | Variable | Distance, low-bed availability, permits |
Ask for a CIF quote rather than FOB and the first two lines are settled for you. The last two are yours to confirm with a broker, and they are worth confirming before you choose a machine size — a 30-ton machine can cost less per tonne to buy and more to move.
When a single unit is the wrong choice
If your project needs three machines within the same quarter, three single-unit bookings will usually cost more in freight than one container, and they expose you to three separate vessel delays. The exception is when you are testing a supplier: one unit, inspected and shipped cleanly, tells you more about a seller than any amount of correspondence.
Questions buyers ask before ordering
Can I buy just one used excavator?
Yes. Single-unit orders are routine. The machine ships in shared container space or on a flat rack, and we quote the freight both ways so you can see the difference before you decide.
Do you have a minimum order value?
No fixed minimum value. What changes with order size is freight per unit, not our willingness to sell. Parts-only orders are also accepted, though freight is usually poor value under about 1 cubic metre.
Can I mix machines and spare parts in one container?
Yes, and it is common. Parts are packed into the voids around the machine and blocked against movement. Send the parts list before booking so the loading plan accounts for the volume.
Is the price the same for one unit as for ten?
No. Machine price depends on model, year and condition; freight per unit drops as the container fills. Ten units on one booking usually beat ten separate single-unit bookings on total landed cost.
Last verified: 2026-11-06 · Sources: export documents on file, shipping line schedules, port authority notices.